2023 (tarih doğrulanmadı / date unverified)
Adana Tat Nişasta
A 275-ton boiler installation at the Adana Tat Nişasta factory was successfully completed using our Terex CC6800 crane.
2023 (tarih doğrulanmadı / date unverified)
A 275-ton boiler installation at the Adana Tat Nişasta factory was successfully completed using our Terex CC6800 crane.